The condition was found in week three.
Undocumented utility. Grade that doesn't match the drawings. Water with nowhere to go. It becomes a change order, a delay, and a conversation with the owner that nobody wanted to have. The work was fine. The information came late.
This is the industry standard. It is not how we start.