637 SW 10th Street
Water, Sewer, Fire Protection, Roadway Restoration & MOT
Technical Specifications
Project Overview Specs
Institutional Evidence Record
Client
JD Planning & Building
Project
Six Units Apartments Building
Year
2026
Brightway Scope
Underground Utilities + Public ROW + Pavement + Site Concrete + MOT
Services
Domestic Water; Fire Line; Fire Hydrant; Sewer Lateral; Water Main Replacement; Milling & Resurfacing; Sidewalk; Valley Gutter; Curb & Gutter; Type D Curb; MOT; Survey / As-Builts; Testing & Certification
Industry
Multi-Family Residential New Construction / Public ROW
Location
637 SW 10th Street, Miami, FL 33130
Discover the Story
Absorbing Civil Complexity
Detailed engineering narrative covering execution conditions, trade coordination, and regulatory compliance under compressed site constraints.
One Civil Scope From the Main Connection to the Finished Street
At 637 SW 10th Street, Brightway executed a multi-discipline civil package connecting building services to public infrastructure and restoring the surfaces affected by the work. The scope included domestic water services, fire line and hydrant work, a sewer lateral, replacement of an existing water-main segment, trench restoration, roadway milling and resurfacing, sidewalk, valley gutter and curb work.
This project is one of the clearest examples of Brightway's integrated delivery model. Underground utility work did not stop at the pipe. The scope continued through public-work concrete, pavement restoration, traffic-control coordination and testing required to return the site and right-of-way to service.
The scope also included a 15-day MOT setup using barricades, signs and cones, together with survey/as-builts, density testing, bacteriological testing and backflow certification — strong proof for Underground Utilities, Public ROW, Site Concrete, Pavement and MOT within a single execution story.
Field Execution & Quality Standard
Execution sequence coordinated directly with general contractors and site authorities, backed by daily digital logs and strict compliance audits.
Execution Metrics
Project Highlights
WATER + SEWER + FIRE
Integrated utility package
2,215 SF
Listed milling/resurfacing areas
350 SF
Public-work sidewalk
15 DAYS
MOT with barricades, signs and cones
Next Case Study
Pirata Restaurant
Drainage, Exfiltration, Site Concrete & Asphalt Restoration · Miami, Florida
Have A Similar Civil Requirement?
Schedule A Site Walkthrough For Your Active Scope.
Direct consultation with Brightway project managers and field superintendents in South Florida.